Petrochemical sites are among the most congested industrial environments in Europe. New work is rarely on open ground — it is threaded between operating units, existing racks and other contractors, with access negotiated rather than assumed.

The dominant constraint is usually not the technical difficulty of the scope. It is coordination: getting the right trade to the right elevation in the window that has been granted.

Petrochemical complex with storage spheres and process units

02What the sector demands

  • 01Execution alongside operating units without disturbing them
  • 02Tie-in works planned to the hour within a shutdown window
  • 03Coordination with multiple contractors on shared access
  • 04Strict control of hot work, scaffolding and lifting
  • 05Documentation that satisfies both the EPC and the operator

03How Plejad contributes

  • Piping and mechanical crews for brownfield tie-in packages
  • Turnaround manpower mobilised pre-inducted for the window
  • Structural steel modifications within congested areas
  • Electrical and instrumentation works on unit upgrades
  • Prefabrication that removes hours from the site programme

Sector capability statement. Client and project references for this sector are published once released.

Petrochemical complex with storage spheres and process units

11Next step

Have a project in mind?

Send us the scope, the drawings or just the outline. We will come back with the trades, the sequence and a realistic view of the programme.