Shutdowns & Turnarounds

Fixed window. Fixed date. No second chance.

01Overview

A turnaround is the most expensive thing a plant does voluntarily. Every day of overrun is measured in lost production, and the schedule is built backwards from a restart date that does not move.

Plejad mobilises additional qualified trades into turnaround organisations — piping, mechanical, welding and support disciplines — pre-inducted, documented and ready to work shift patterns from day one.

02Capabilities

What this discipline covers.

  • 01Mobilisation of additional qualified trades at short notice
  • 02Piping, mechanical and welding execution during outages
  • 03Tie-in and replacement works within the shutdown window
  • 04Shift working and extended-hours coverage
  • 05Pre-mobilisation induction and documentation preparation
  • 06Support to the client's turnaround management structure

03Typical scope

Work packages typically contracted under this discipline.

  • Planned annual or multi-year turnaround support
  • Emergency outage response with rapid mobilisation
  • Tie-in campaigns connecting new plant to existing
  • Heat exchanger, vessel and piping intervention works
  • Peak-load manpower for the client's own crews
Worker on a scaffolded structure during construction works

Scope is confirmed per project. Capabilities listed here are indicative and adjusted to the specification, permit regime and client procedures of each site.

04Execution approach

How the discipline is planned, staffed and closed out.

  1. 01

    Mobilised before day one

    Inductions, medicals and documentation are completed before the outage starts. Turnaround time is not induction time.

  2. 02

    Built for shift work

    Crews are structured for continuous coverage with a clear handover between shifts, which is where turnarounds lose hours.

  3. 03

    Scope discipline

    Discovered work is raised through the client's change process immediately, not absorbed quietly and argued about later.

  4. 04

    Demobilise clean

    Documentation, tooling and the working area are closed out as the unit hands back, not weeks after restart.

05Where it applies

Sectors we can support

Worker on a scaffolded structure during construction works

11Next step

Have a project in mind?

Send us the scope, the drawings or just the outline. We will come back with the trades, the sequence and a realistic view of the programme.