Equipment Installation

Set, aligned, connected, signed off.

01Overview

Equipment installation compresses a lot of risk into a short period. The item is expensive, the lift is one-time, and the alignment tolerances that matter are usually tighter than the drawing suggests.

Plejad handles receipt, positioning, setting, levelling, alignment and mechanical hook-up of process equipment, working with the supplier's requirements and the site's lifting regime.

02Capabilities

What this discipline covers.

  • 01Receipt, inspection and handling of delivered equipment
  • 02Positioning and setting on foundations or steelwork
  • 03Levelling, grouting coordination and final alignment
  • 04Coupling alignment for rotating equipment
  • 05Mechanical hook-up to piping and services
  • 06Lift planning coordination for heavy items

03Typical scope

Work packages typically contracted under this discipline.

  • Installation of pumps, compressors and rotating equipment
  • Setting of vessels, columns and heat exchangers
  • Production machinery installation and hook-up
  • Equipment replacement within an operating plant
  • Relocation of machines between production areas
Row of heavy lifting cranes against an open sky

Scope is confirmed per project. Capabilities listed here are indicative and adjusted to the specification, permit regime and client procedures of each site.

04Execution approach

How the discipline is planned, staffed and closed out.

  1. 01

    Check before you lift

    Foundations, anchor positions and the delivered item are verified against the drawing before the crane is committed.

  2. 02

    Planned lifting

    Rigging, lift points and the sequence are agreed with the site's lifting regime — including exclusion zones and weather limits.

  3. 03

    Alignment to record

    Levelling and alignment readings are taken and recorded, and repeated after grouting and after connecting piping.

  4. 04

    Handover to commissioning

    Equipment is handed over with the installation records the commissioning team needs to accept it and turn it.

05Where it applies